Why should the concrete foundation be built when the coater is installed?


Published:

2022-03-04

Due to the influence of corrosion, aging, equipment alarm and other factors, the concrete base and other parts will be damaged, resulting in the loosening of bolts fastening equipment, which seriously affects production. The management of traditional concrete pouring method will greatly extend the time of correction, which is difficult for the company to accept. Polymer composite materials have handled this problem equally well. The impact resistance and compressive strength of the materials themselves are far greater than those of today's concrete materials. They also adhere to steel and other rough surfaces together, and can be cured quickly. It is a new scientific research achievement to correct the damage of the concrete base of the coater. Before coating, load the clean and stretched screen plate from the front of the coater, or load the screen plate from the side of some models. Among the models designed for large mesh frames, side mounting is more common. Because the mesh frames are large and bulky, side mounting can reduce the lifting and moving amount. When the automatic screen coater and other automatic screen disposal equipment (such as cleaning equipment, regeneration equipment, boring installation and developing machine) are running online, it is more convenient to install the plate from the side. No matter how the screen is installed, if the screen is in the correct position at this time, the pneumatic clamping installation or our mechanical clamping installation is closed to lock the screen. In order to operate more easily, many coaters have pedals to control the clamping action, which is also convenient for our coater operators to free their hands to control the screen. After finishing the screen plate, pour the corresponding photosensitive emulsion into the automatic coater, and then start coating. According to the functions of the control system and equipment, the equipment can stop coating both sides of the screen at the same time. There are two methods of coating: one is to apply photosensitive emulsion on the screen through repeated wet pressing operations; Or in each coater after coating plus boring process. A machine for quantitatively coating liquid (or melt) macromolecular materials such as adhesives or coatings on the external surface of our materials to be treated.

Due to the influence of corrosion, aging, equipment alarm and other factors, the concrete base and other parts will be damaged, resulting in the loosening of bolts fastening equipment, which seriously affects production. The management of traditional concrete pouring method will greatly extend the time of correction, which is difficult for the company to accept.
Polymer composite materials have handled this problem equally well. The impact resistance and compressive strength of the materials themselves are far greater than those of today's concrete materials. They also adhere to steel and other rough surfaces together, and can be cured quickly. It is a new scientific research achievement to correct the damage of the concrete base of the coater.
Before coating, load the clean and stretched screen plate from the front of the coater, or load the screen plate from the side of some models. Among the models designed for large mesh frames, side mounting is more common. Because the mesh frames are large and bulky, side mounting can reduce the lifting and moving amount. When the automatic screen coater and other automatic screen disposal equipment (such as cleaning equipment, regeneration equipment, boring installation and developing machine) are running online, it is more convenient to install the plate from the side. No matter how the screen is installed, if the screen is in the correct position at this time, the pneumatic clamping installation or our mechanical clamping installation is closed to lock the screen.
In order to operate more easily, many coaters have pedals to control the clamping action, which is also convenient for our coater operators to free their hands to control the screen. After finishing the screen plate, pour the corresponding photosensitive emulsion into the automatic coater, and then start coating. According to the functions of the control system and equipment, the equipment can stop coating both sides of the screen at the same time. There are two methods of coating: one is to apply photosensitive emulsion on the screen through repeated wet pressing operations; Or in each coater after coating plus boring process. A machine for quantitatively coating liquid (or melt) macromolecular materials such as adhesives or coatings on the external surface of our materials to be treated.